AIRWORTHY//30 · Independent Canadian Military Airworthiness TrainingEnrollment Open

// CANADIAN MILITARY AIRWORTHINESS IN 30 DAYS

Canadian Military Airworthiness in 30 Days.

AIRWORTHY//30 is an independent professional-development course covering the CAF Technical Airworthiness Program, the Technical Airworthiness Manual (TAM), type design approval, design standards, continuing airworthiness, and foreign military type designs in Canada. Learn in short daily lessons across five modules.

30 DAYS5 MODULES90 SCENARIO QUESTIONS80% PASS BARVERIFIABLE COMPLETION CERTIFICATE
REF: TAM C-05-005-001/AG-001 — Technical Airworthiness Manual
TAM C-05-005-001/AG-001◆TAM PART 2 CH. 5 — TDE◆MIL-HDBK-516C◆EMACC◆DEF STAN 00-970◆AWM◆14 CFR (RECOGNIZED CODE)◆EASA CS◆DO-178C◆DO-254◆ARP4754A◆CAR 102.01(A)◆AERONAUTICS ACT S. 3(1)(B)◆EFP / SPFP◆
TAM C-05-005-001/AG-001◆TAM PART 2 CH. 5 — TDE◆MIL-HDBK-516C◆EMACC◆DEF STAN 00-970◆AWM◆14 CFR (RECOGNIZED CODE)◆EASA CS◆DO-178C◆DO-254◆ARP4754A◆CAR 102.01(A)◆AERONAUTICS ACT S. 3(1)(B)◆EFP / SPFP◆

// SECTION 02 — THE DAILY PROTOCOL

One daily lesson. Three phases. Engineered retention.

Every lesson unlocks at 06:00 your local time and lands in your inbox as a BLUF briefing with a deep link. Open, run the protocol, close the day. The docket advances itself — you just fly the profile.

APPROX. 15–20 MINUTES PER DAY
01
Phase 01

Spaced Repetition Refresher

03:00

Two flashcard and scenario prompts drawn from material taught 2–5 days ago — surfaced precisely where the forgetting curve says you'll need them.

02
Phase 02

Core Deep Dive

10:00

BLUF summary, regulation excerpts, comparison tables, and real certification case studies — the document, engineered for a working engineer's attention span.

03
Phase 03

Interactive Assessment

05:00

Three scenario questions with real-time evaluation and Means-of-Compliance mapping. The course uses an 80% pass threshold.

// SECTION 03 — SYLLABUS

The 30-day docket.

View Full Curriculum

Type Design Approval & Certification in the CAF

MODULE M2 · DAYS 06-12

The heart of the course. The DND Type Certificate, Type Design Examination, certification-basis construction, and the procedural machinery every CAF certification program runs on.

DND Type CertificateTAM Part 2 Ch. 5 - TDERelease to Service
D06The DND Type Certificate and the Military Aircraft RegisterDND Type CertificateAirworthiness ClearanceRelease to Service

The CAF lifecycle: TC, TDE, airworthiness clearances, and Release to Service.

D07Type Design Examination - TAM Part 2, Chapter 5TAM Part 2 Ch. 5TDE Levels 1/2/3

Assessment of Acceptability and Assessment of Applicability - credit toward a DND Type Certificate, not itself an approval.

D08The Certification Basis and the Certification PlanTAM 2.1.2.R3/S3Special Conditions

Recognized code and/or OCA basic-vehicle basis, military additions, and special conditions.

D09Means of Compliance in Military ProgramsMoC CodesAETE Flight TestEFP

Analysis, test, inspection, demonstration, similarity - compliance showing under AETE engineering flight test.

D10Pathways Case Lab - MOTS, Modified, and DevelopmentalCC-177 MOTSCH-147FCH-148

CC-177 off the shelf, CH-147F modified via TDE, CH-148 developmental - and the F-35A with no civil TC.

D11Design Changes in ServiceTAM Part 3 Ch. 2Design Change Certification

Military modifications, contractor certification, and configuration control.

D12Module Assessment - Mock TDE Compliance MatrixAssessmentTAM Part 2 Ch. 5TAM 2.1.2.R3MIL-HDBK-516C

Full case study: rebuild the certification basis and defend the compliance matrix for a fleet modification gone sideways.

// SECTION 04 — PLATFORM

An automated learning system.

Daily Unlock Engine

Each day's lesson unlocks at 06:00 your local time. An email lands with a BLUF summary and a deep link — open, learn, done before your first coffee.

NEXT UNLOCK T−07:24:31

Spaced Repetition Refresher

Every morning re-opens with two targeted prompts from 2–5 days back — the forgetting curve, countered by design.

D−3 RECALL

Which section defines damage tolerance?

ANSWER

§ 25.571 — RECOGNIZED CODE

MoC Compliance Mapping

Assessments map every answer to its Means of Compliance — MC1 through MC6 — so you think like the TAA project officer across the table.

§ 25.1309(a) — FHA
§ 25.1309(b) — PSSA
§ 25.671(c) — SSA
DO-178C — DAL B

Verifiable Completion Records

Pass the Day-30 final and receive a private certificate of course completion with a unique verification ID and QR code, validated publicly at /verify.

Certificate of Completion

AW30-7X2K-9Q4M

Sample certificate illustration: read about course completion records

SAMPLE

Engineer inspecting a turbofan engine in a night maintenance hangar
FIG. 01 — Type Design Examination Review

CASE FILE — DAY 12 PRACTICAL

The fleet modification that almost flew without a certification basis.

"The contractor called it a minor design change. The Type Design Examination said otherwise."

On Day 12 you inherit a mock program: a DND-unique avionics change to a foreign military type design, claimed as covered by the original Type Design Examination. The certification basis was never re-established for the DND-unique changes — and the compliance matrix has a hole exactly where the system safety assessment should be.

Working from the TAM's own certification-basis rules, you rebuild the basis under a recognized military code, classify the design change, and defend a Means of Compliance for every affected clause — the same exercise a TAA project officer runs when a fleet program goes sideways.

TAM Part 2 Ch. 5TAM 2.1.2.R3MIL-HDBK-516C

// SECTION 05 — COURSE COMPLETION

Earn the document.

Completion is documented with a private certificate of course completion, a verification ID, and a QR code that resolves to a public record at /verify. Anyone can confirm the course record in seconds without an account.

  • High-resolution PDF certificate of completion
  • Unique verification ID — AW30-XXXX-XXXX
  • QR-validated in one scan
  • Cumulative 30-question final at an 80% pass bar

SAMPLE CERTIFICATE — FICTIONAL LEARNER

Certificate of
Course Completion

AIRWORTHY//30 course-completion seal

This confirms that

EXAMPLE LEARNER

has completed AIRWORTHY//30 — Canadian Military Airworthiness in 30 Days — and passed the cumulative final examination at 80% or better.

Verification ID

AW30-7X2K-9Q4M

SAMPLE RECORD — NO CREDENTIAL ISSUED

Sample certificate: learn about completion records

Independent course record · Not a government-issued credential

COURSE COMPLETE

// COURSE QUESTIONS

About the Canadian military airworthiness course

What is AIRWORTHY//30?

AIRWORTHY//30 is an independent, 30-day professional-development course about Canadian military airworthiness. Five modules cover the Canadian framework, type design approval, design standards, continuing airworthiness and foreign military type designs.

Who is the course for?

The course is designed for professionals and learners who want to understand Canadian military aviation engineering, maintenance and project decisions. Choose plain-language Understanding and Application lessons or the more detailed Technical and Regulatory Practice path. Both paths share the course assessments and completion record.

How much time should I plan for?

Plan approximately 15–20 minutes for a daily lesson, with a refresher, a core explanation and scenario questions. The curriculum spans 30 days. Optional supplemental learning is separate from the core course, exam and certificate requirements.

Is this an official DND or CAF qualification?

No. AIRWORTHY//30 is independent and is not affiliated with, endorsed by or approved by the Government of Canada, DND, the CAF or an airworthiness authority. Its certificate records course completion and does not grant a licence, accreditation, delegation, authorization or regulatory qualification.

What is the Technical Airworthiness Manual?

The TAM contains the rules, standards and advisory material for the DND/CAF Technical Airworthiness Program. Its companion, the Airworthiness Design Standards Manual, addresses aeronautical design standards and their application. Read the official TAM overview and official ADSM overview.

Can course completion authorize an airworthiness decision?

No. The lessons support education and professional development. Always use current official publications, your actual authority and your organization’s approved procedures for engineering, maintenance, certification and operational decisions. Read our independence and credential notice.

Explore the full 30-day curriculum or follow the official Canadian military airworthiness references.

30DAYS

BEGINDAY01.

Your docket opens tomorrow at 06:00 local.

Self-Paced · Daily Unlocks · Certificate of Completion